Deviation of the Main North Line on 2021-05-25
Kiwirail Networks opened the deviation of the Main North Line between 262 and 263 km (Tunnel 21) and announced it on the 2021-05-25 on their website. A way has been added to OHM showing the closed section of track. I’m new to OHM but have extensive experience drawing my own maps in a GIS so this i…